Water Stagnation & Reprofiling Works – Muscat Municipality
Al Zakwani Enterprises successfully carried out critical water stagnation elimination and land reprofiling works for the Muscat Municipality, addressing long-standing drainage and flooding challenges in urban and residential areas.
- Surveying and identification of low-lying areas prone to water accumulation
- Reprofiling of terrain to improve natural water runoff and drainage flow
- Backfilling and leveling of depressions using engineered fill
- Construction of drainage channels and minor earthworks to redirect surface water
Our timely execution, technical precision, and adherence to municipal standards ensured long-term relief from water stagnation, contributing to improved public safety, infrastructure durability, and environmental hygiene across affected zones.
Beautification works done for Muscat Municipality
- Construction of Proposed Solution to resolve water Stagnation at Bausher –Reprofiling of way No.3742, South Al Ghubrah, Contract No.0422/2020.
- Maintenance works of Storm Water stagnation sites at Mumtaz Area-Ruwi Muttrah , Contract No.0316/2020
- Construction of Walkway at Al Khuwair Park, Contract No.0436/2020.
- Maintenance of Storm Water stagnation sites at Sidab in Muscat, Contract No.0317/2020.
- Maintenance Works of Storm water Stagnation Sites near Friday Market at Wadi Al Kabir in Muttrah
, Contract No. 0322/2020. - Construction of Proposed Solution to resolve water Stagnation at Bosher –Way No.4603, Azaiba,
Contract No.0424/2020. - Maintenance Works of Storm water Stagnation Sites near Friday Market at Wadi Al Kabir in Muttrah
, Contract No. 0322/2020. - Construction of Proposed Solution to resolve water Stagnation at Bausher –Reprofiling of way No.1828, Qurum, Contract No.0436/2020.
- Construction of Proposed Solution to resolve water Stagnation at Bousher (Al Ansab) Contract No.0421/2021.
- Construction of Proposed solution to resolve water stagnation Contract No. 214/2021
- Construction of Proposed solution to resolve water stagnation Contract No. 041/2022
- Construction of Proposed Roadside Protection (cutoff Wall & Riprap) and Road Shoulders Preperation (ABC) Contract No. 042/2022
- Construction of Proposed solution to resolve water stagnation Contract No. 043/2022
- Construction of Proposed solution to resolve water stagnation at Bousher (37) Contract No. 044/2022