loading

Water Stagnation & Reprofiling Works – Muscat Municipality

Al Zakwani Enterprises successfully carried out critical water stagnation elimination and land reprofiling works for the Muscat Municipality, addressing long-standing drainage and flooding challenges in urban and residential areas.

Our timely execution, technical precision, and adherence to municipal standards ensured long-term relief from water stagnation, contributing to improved public safety, infrastructure durability, and environmental hygiene across affected zones.

Beautification works done for Muscat Municipality
  1. Construction of Proposed Solution to resolve water Stagnation at Bausher –Reprofiling of way No.3742, South Al Ghubrah, Contract No.0422/2020.
  2. Maintenance works of Storm Water stagnation sites at Mumtaz Area-Ruwi Muttrah , Contract No.0316/2020
  3. Construction of Walkway at Al Khuwair Park, Contract No.0436/2020.
  4. Maintenance of Storm Water stagnation sites at Sidab in Muscat, Contract No.0317/2020.
  5. Maintenance Works of Storm water Stagnation Sites near Friday Market at Wadi Al Kabir in Muttrah
    , Contract No. 0322/2020.
  6. Construction of Proposed Solution to resolve water Stagnation at Bosher –Way No.4603, Azaiba,
    Contract No.0424/2020.
  7. Maintenance Works of Storm water Stagnation Sites near Friday Market at Wadi Al Kabir in Muttrah
    , Contract No. 0322/2020.
  8. Construction of Proposed Solution to resolve water Stagnation at Bausher –Reprofiling of way No.1828, Qurum, Contract No.0436/2020.
  9. Construction of Proposed Solution to resolve water Stagnation at Bousher (Al Ansab) Contract No.0421/2021.
  10. Construction of Proposed solution to resolve water stagnation Contract No. 214/2021
  11. Construction of Proposed solution to resolve water stagnation Contract No. 041/2022
  12. Construction of Proposed Roadside Protection (cutoff Wall & Riprap) and Road Shoulders Preperation (ABC) Contract No. 042/2022
  13. Construction of Proposed solution to resolve water stagnation Contract No. 043/2022
  14. Construction of Proposed solution to resolve water stagnation at Bousher (37) Contract No. 044/2022